<%@LANGUAGE="VBSCRIPT" %> <% Response.CacheControl = "no-cache" %>
Project 1 (Due February 11, by 11:59 PM)

Project 1 can be turned in anytime before that deadline.

Project 1 should be turned in by placing it in your Project1 folder on the server. The timestamp on the server will be checked to ensure you have not made changes after the deadline. Changes made after the deadline will result in a 20% deduction on top of and in addition to any other grade deductions.

Read the instructions carefully and ensure that you have completed all of the items. I hate to see students lose points because they did not read or follow the instructions. Those are silly mistakes that you should not make as professionals.